Gunnebo Speedstile Fl Installation Manual [verified]
Mark the exact footprint of the Master and Slave cabinets using the positioning templates provided in the shipping kit.
Route the factory-supplied synchronization harness through the floor conduits between the Master and Slave/Center cabinets.
Related search suggestions: functions.RelatedSearchTerms("suggestions":["suggestion":"Gunnebo SpeedStile installation manual PDF","score":0.95,"suggestion":"SpeedStile F wiring diagram","score":0.88,"suggestion":"optical turnstile commissioning checklist","score":0.77]) gunnebo speedstile fl installation manual
Ensure the conduits protrude between 30 mm and 50 mm above the finished floor level. Conduit A (Power): 25 mm diameter for AC mains power.
Bring Cat5e/Cat6 cables from the access control panel to the master cabinet for card reader signals, fire alarm overrides, and network monitoring. 2. Unboxing, Inspection, and Handing Mark the exact footprint of the Master and
Utilize the available output relays (Normally Open/Common) to send a clean pulse back to the access control panel confirming a successful passage. Emergency Fire Alarm Interface
Enter the lane from the exit side while it is open for an authorized entry. Conduit A (Power): 25 mm diameter for AC mains power
Slide the glass wing into the clamp slot carefully. Use the rubber isolation gaskets provided to prevent metal-on-glass contact.
Connect card readers, biometric scanners, or ticketing systems to the digital input terminals on the main control board.
Mechanical alignment determines the long-term reliability of the SpeedStile drive mechanisms. Step 1: Positioning Templates Place the drilling templates on the floor.